After I Picked Up the Immortal Bottle

Chapter 327: Groundbreaking

This plan can be said to be comprehensive, and it is difficult to find faults. It is fully in line with Li Zhe's vision of a world-class tourist resort, and he is indeed a top design planner!

"Director Wang, I am very satisfied with this set of design plans. I have worked hard and have a happy cooperation!"

"Happy cooperation!"

Wang Cheng saw that Li Zhe was satisfied with his plan and was very happy. It was also a challenge and an opportunity for him to design such a world-class tourist resort. The facade of a top designer is his work. With such a world-class tourist resort from his own hand, it is also an opportunity for him to prove himself.

Moreover, this also made Wang Cheng have one more admiration for Li Zhe. During the design process of the plan, Li Zhe was really just as he said at the beginning, and he didn't make any gestures once. It can be said that it is completely complete. Just let yourself play, not even a small change!

"Working with such a young and courageous person is a pleasure!"

The design team under his hands is also full of joy, being able to witness the birth of such a world-class tourist resort design plan, and he himself has participated in it personally. It is a highlight in the resumes of himself and others!

After that, whether it is a job-hopping or self-employment, this experience is all capital!

With the design plan, the next step is to build this tourist resort according to the blueprint described in the design plan.

Li Zhe also asked people from the company's administrative department to contact a capable and qualified construction company!

For such a large project, billions of dollars of investment are basically spent on this early-stage infrastructure, and no major construction company does not want to take this project!

So after the staff of the administration department contacted the major construction companies, all construction companies showed great interest!

In the end, each company was doing almost everything, bombarding all kinds of phone calls, and visiting. If Li Zhe hadn't strictly ordered the people below not to reveal his information, it is estimated that his small yard would have been trampled long ago. Up. Li Zhe has experienced the feeling of being surrounded by everyone!

In the end, there was no way. A project of this size could not be decided rashly. Li Zhe could only decide to adopt the fairest method-bidding! This can also save some costs.

After instructing the people below to release the public bidding announcement, the major construction companies soon used all means to compete for this project.

Of course, the construction companies that can participate in this bidding are all big companies with both reputation and strength. Li Zhe does not want to have defects or even problems in the multi-billion project! Screening has already been done in the early stage.

For a time, the relevant departments of several major domestic construction companies are studying the design plans provided by Li's Agricultural Co., Ltd. throughout the night, in order to calculate the required costs as soon as possible, and then discuss the price with other companies. Game!

Li Zhe did not go to the bidding meeting and asked Jianbing to come forward. He doesn’t like this kind of occasion either. It’s not the same as the last time I went to the Rongcheng Flight Attendant College to recruit. They were all beautiful women, and all the construction workers were rough guys. The atmosphere was tense and serious. Anyway, Li Zhe would definitely sit there. If you can't stop it, why bother yourself.

After the bidding result comes out at that time, the employees below can report to him.

After the bidding meeting was over, it was determined that the construction company to cooperate with was one of the top domestic construction companies. The reputation and strength were very good. Li Zhe agreed after understanding.

On the day the contract was signed, a large number of machinery and equipment officially entered the back mountain of Lijiaji!

Excavators, bulldozers, tower cranes and other large-scale engineering tools are all in short, and a large number of construction workers have also entered the construction area. The entire back mountain is full of people and machinery!

Moreover, in order to protect the wild animals in the wild animal reserve from being disturbed and affected, Li Zhe also dedicated his own funds to transfer the wild animals in the reserve, and then put these wild animals in after all the transformations are completed.

On the day of construction, a ground-breaking ceremony was deliberately held. Li Zhe, as the representative of Party A, had to attend. The construction company also dispatched the highest-level boss to show respect. After all, billions of projects are also very important for them.

The local media also made a special report, which is also a task assigned by the government. Naturally, it is necessary to vigorously publicize this kind of project that can increase local reputation and promote the development of tourism.

······

After Li Zhe and the boss of the construction company cut the ribbon together, the whole project has completely begun to break ground!

The construction company's plan is to divide the entire tourist resort into two parts and carry out construction at the same time to speed up the progress. The two major areas of the Seven-color Flower Sea and the Wildlife Protection Park will be constructed at the same time. This can be done with the strength of their company.

Since the overall design plan this time is a return to nature and purely original ecology, it is clear that modern materials such as concrete cannot be used or used as little as possible. This is also a challenge for construction companies, but it is not a problem. The problem is that the cost will increase a lot.

The large-scale machinery is mainly concentrated on the side of the Qise Flower Sea. The wildlife park area is more of a group of construction workers. They are not so much construction workers as they are a group of artists. They will transform the entire wildlife protection park as a whole. Without changing the territorial scope of various animals, the entire park and the surrounding environment should be integrated as much as possible.

Because of the particularity of this project, the construction company has also dispatched talented soldiers. These construction workers are not just construction workers. They are all generalists, construction, gardening, simple design, etc.······

The originally isolated brick walls were completely demolished, and the construction workers transplanted a large number of tall trees on the original location of the separation wall. These trees were all taken from local materials and transplanted from the top of the hill near the sea of ​​colorful flowers. In addition, using local materials can also make this wildlife protection park more integrated with the surrounding mountains and forests, without a very abrupt feeling.

A certain distance between each tree, and then planted cliff vines in the middle. This vine grows fast and is highly ornamental. When the entire project is completed, these vines will almost fully rise. These vines are not only ornamental. In addition, it can effectively prevent wild animals from running out of the park.

The workers also designed a domed vine corridor here. At that time, the vines were induced to extend from the top of the tree to the big tree on the opposite side of the road, forming a passage covered by vines in the middle.

Imagine how timid it is to walk on such a small road covered by vines in the summer afternoon and watch the nationally protected animals in the wildlife sanctuary through the gaps in the vines.

And if you don’t want to see through the vines, there is a path that extends into the park. It is completely unobstructed and allows you to observe the protected wild animals up close. The animals in this wild animal protection park are not attacked. Sexual, so don’t worry about safety.

As for the impact on wild animals, Li Zhe’s tourism resort is advertised as high-end, the world’s top, and its clientele is the rich. If you want to come, these rich people should not do anything demeaning to these wild animals. What the animals do, and there will definitely be staff in the park!

On the other side of the Seven-Colored Flower Sea, this series of major projects are underway!

A large number of bulldozers and excavators drove up the hills around the Qi-color Flower Sea and started working! All the construction workers were shocked after seeing this sea of ​​seven-color flowers. They have been engaged in construction for so many years, and they have never seen such a shocking sea of ​​seven-color flowers before traveling north and south!

Now these workers finally know why Party A’s company has to invest billions to build a tourist resort in the remote mountains of this uncharacteristic poor country. This sea of ​​colorful flowers is the biggest feature!

Because the land in the Qise Flower Sea was selected by Li Zhe at that time, he chose a concave-shaped plot to plant the Qise Flower, surrounded by mountains on three sides and one side with openings.

However, the design plan envisages the construction of a group of single-family villas around the sea of ​​seven-color flowers in a mouth shape for customers to live in to maximize resource utilization. And every villa must be able to clearly see the scene of the sea of ​​seven-color flowers below. Therefore, the direction of the opening needs to be artificially created by a hill.

The vegetation and trees on the other three sides of the mountain also need to be removed, and the ground needs to be leveled, and the extra soil can be used to fill in the direction of the opening to fill a mountain!

As for the construction of single-family villas, local materials are selected and the numbers clearly defined on the top of the mountain are used as raw materials. The appearance is a high-end wooden house villa, but the wood is only used on the outside, and the inside still needs to use reinforced concrete structure. It is taller, but the interior decoration will be as close to nature as possible, and will not let people see that this is a reinforced concrete structure house, all returning to nature.

With the current level of construction, this level can still be achieved.

The paths connecting the whole tourist resort are not paved with concrete at all. Instead, they use the original ecological dirt roads, with fallen leaves and various debris on it, which are more natural.

In some places, there will be stone roads or gravel roads, which are common in the countryside.

With the two main landscapes of the Qi-color Flower Sea and the Wild Animal Park, it is necessary to create some small landscapes in other places to increase the exquisiteness of the entire tourist resort. After all, the natural conditions of the back mountain in Lijiaji are indeed good. There are deep mountains and old forests, but that kind of special landscape is really rare, so it needs to be built artificially.

Like the small waterfall at the end of the trail, the cliff-like stairs, the large vine swing, etc., the vine trail outside the wildlife protection park belongs to this kind of small landscape.

This is all based on the design plan after careful consideration by the Wangcheng and the design team. After personal visits to the entire area, the Wangcheng has designed more than 60 small landscape projects in the design and planning plan, which is enough to make travel and vacation here. Tourists on vacation in the area can almost see a scene after two steps!

This is also where Li Zhe is most satisfied with the design plan!

I like to ask everyone to collect it after I picked up the fairy bottle: (ltnovel.com) After I picked up the fairy bottle, the literary update speed is the fastest.

Tap the screen to use advanced tools Tip: You can use left and right keyboard keys to browse between chapters.

You'll Also Like