Doomsday Bunker Upgrade

Chapter 112: Production of ground source heat pump

The new storage space brought by the upgrade of the    storage room has not increased too much, but an additional five square meters of food storage room has been expanded.

   But this is a lot more spacious than the original ten square meters of space where both food and supplies are placed, at least Chen Xin doesn't have to face the materials all over the floor.

   Especially the extra shelves on the wall. After placing the steel bars and some small parts, the floor of the storage room can be said to be much cleaner. Except for the cement, there is nothing left on the floor.

   This way, a lot of space is freed up.

   At least Chen Xin can drag the two outdoor air conditioners stacked beside the workbench into the material storage room instead of stacking them in the way.

   dragged the two outdoor air conditioners into the storage room, Chen Xin returned to the workbench and opened the system interface.

  The workbench produced by the system can not only manufacture various equipment and process various parts with the help of the system, but it can also be used to disassemble various things.

   Of course, this is a function of the workbench itself, but with the power of the system, Chen Xin can make dismantling work easier, and recycling resources can be more efficient.

   For example, when he is sitting in front of the workbench, he can see the two outdoor units of the air conditioner that have been stuffed into the storage room on the system interface, and show the status of detachable recycling resources.

   Obviously, under the power of the system, Chen Xin can already sit in front of the workbench and directly disassemble the things in the storage room.

   Looking at the external air conditioner that was displayed as detachable, Chen Xin hesitated for a while, then clicked on disassembly and disassembled one of them into parts.

  The parts did not appear on the workbench, but were still placed in the storage room.

   However, Chen Xin, who finished ordering the disassembly, came to the storage room again curiously, wanting to see what is left of the air conditioner after the system was disassembled.

   In the storage room at this time, there was one less air conditioner outside that was originally stacked by Chen Xin against the wall, and there were many more disassembled parts in the empty space on the side shelf.

   Chen Xin walked to the shelf and picked up the disassembled parts, recognizing that this was the compressor, one of the most important parts of the air conditioner.

   These are also necessary parts for Chen Xin to manufacture ground source heat pump equipment. Although there is a system to help Chen Xin build ground source heat pumps, he cannot make these parts because of the insufficient level of the workbench.

   Facing this kind of setting, it seems that certain parts in the game cannot be made, and can only be obtained by field collection or missions, Chen Xin is not surprised.

In the case of ready-made parts, it is not difficult to create a usable ground source heat pump equipment through the transformation of the pipeline and the splicing of the parts. Even as long as the parts are okay, Chen Xin can also integrate The ground source heat pump equipment is assembled.

   However, just relying on the tools on the workbench now, wanting to build a compressor by yourself, this is simply a fantasy.

   Although the compressor used in the air conditioner looks like two long pots, one large and one small, connected together, the structure inside is quite complicated.

   Chen Xin did other jobs before he became a full-time writer and started writing online novels. Because of his work, he was also exposed to machinery manufacturing.

   He clearly knows that the manufacture of a compressor cannot be done in a hand-made workshop. Even if the compressor is disassembled into parts and given to him, he may not be able to put all the parts back in.

   In other words, even if it can be put back, Chen Xin is not sure if this compressor will work.

  Because the compressor is under high pressure when it is working, in this case, even a slight leak or improper assembly may turn the compressor into a bomb, causing serious consequences.

   Therefore, the manufacturing and processing of this kind of things requires real industrial-level processing and manufacturing capabilities, not garage hand workshops.

   Chen Xin doesn't really care about this situation. He doesn't have a high demand for this kind of equipment parts. The materials provided by the SWAT team are enough to meet his needs.

   And there is a system, if it is really not available, Chen Xin can continue to upgrade the workbench and workshop so that it can finally produce the parts and equipment he needs.

   Chen Xin, who had no intention of working at all, looked at the dismantled parts, somehow became interested, and returned to the workbench, planning to build the first ground source heat pump.

  The ground source heat pump equipment does not have system drawings for reference like the firearm drawings on the workbench of the weapon cabinet, and it is foolish operation with the powerful functions of the system.

  The ground source heat pump equipment without drawings and references needs to be assembled bit by bit by Chen Xin. All the system can provide is only some assistance.

   Just like Chen Xin built an oxygen generator before, the system can at most help him process materials, improve the accuracy and quality of parts, and can't replace him by directly processing materials into parts.

   However, this is not difficult for Chen Xin. Although the structure of the ground source heat pump system is a bit complicated, UU Reading www.uukanshu. com, but there are related structure flow diagrams and general circuit diagrams on Chen Xin's notebook. According to the drawings, Chen Xin can still assemble the entire equipment.

   It's just that although it can be installed, the things Chen Xin assembled are still rough.

   And there is one thing that Chen Xin hadn't thought of before, that is, the refrigerant used in the materials he saw in the ground source heat pump equipment is usually water, unlike the refrigerant used in household air conditioners, which is a chemical refrigerant.

  Water is a medium with the highest latent heat of evaporation in nature, and the heat carried from liquid to gas is also the largest, but for small household air conditioners, using water as a cooling circulation medium is not suitable.

  The refrigerant used in household air conditioners is a chemical medium that is small in size, fast in effect, and can vaporize, compress and condense at room temperature.

   As for air conditioners that use water as the cooling circulation medium, there is no lack of air conditioners. The advantages of water are reflected in large-scale central air conditioners or working places like ground source heat pumps that require cooling circulation medium to carry more heat.

   This is actually like the difference between small trucks and large trucks. Small trucks pull less, but are fast and flexible, suitable for small-scale use; while large trucks pull more, but are large in size and slow in speed, so they are suitable for large-scale use.

   But now Chen Xin does not consider directly replacing the remaining cooling medium in these equipment with water, but to assemble the equipment first.

After all, this is only the external unit of the household central air conditioner, and the cooling circulating medium used in it is still a chemical medium, which also results in the fact that its circulating pipe is actually very small. The evaporator and condenser are also designed for chemical media , Does not apply to water.

   If it weren't for the system, Chen Xin wouldn't be able to do it even if he wanted to, but with the system, it would not be too troublesome to modify the cooling circulation medium.

Tap the screen to use advanced tools Tip: You can use left and right keyboard keys to browse between chapters.

You'll Also Like