Rumble!

Rumble!

Rumble!

Accompanied by several roars in succession.

The mountain where the limestone veins are located has been blown out of a large hole.

Wait until the flying dust falls.

Li Mo unceremoniously began to collect limestone

Back near the shelter, he began preparations before firing the cement.

I won’t talk about digging caves or something.

Limestone, iron powder, sand and other materials are mixed in a certain proportion and enter the specially made iron ink mill to make cement raw material.

Later, Li Mo went to dig up coal and gypsum.

After doing that.

He sent the manufactured raw material to the kiln, and after high-temperature calcination, he made cement clinker.

At this point.

Li Mo added a certain amount of cinder powder and gypsum powder to the cement clinker.

The whole process lasted three days.

Fortunately, he paid off, and he harvested a lot of cement.

In the past three days, in addition to burning cement, he also found a suitable place by the river and planned an aqueduct, intending to install vertical water wheels there.

At that time, the water can drive the water wheel to rotate because of the drop impact, which is equivalent to an additional motor that does not use electricity.

The blades of the vertical water wheel are made of wood by Li Mo, and the hardwood is selected, which has high hardness and corrosion resistance and is not afraid of water.

Previously, when he was making tools, he made a full set of carpenter’s tools, including planers and saws, and it was not too difficult to process water wheels.

Except for water wheels.

The rotating paddles and iron shafts, as well as the center hinge, are also ready.

Everything.

He immediately turned into a muddy water master and processed the base of the aqueduct and the vertical water wheel.

Besides.

He also leveled the land near the water wheel, which would be his workshop, where he would wrought iron and make workpieces.

While waiting for the concrete of the water wheel base to be fixed.

Li Mo began to build his wooden house.

The wood only dried for two or three days.

Even if he lit a fire next to the wood pile to dry these days, the moisture content of the logs was still very high.

Using these woods to build a house will inevitably crack in the future.

But.

Li Mo didn’t care much about this.

After all, he also does not guarantee how long he will live here, and when he is in a good mood one day, he may burn a batch of red bricks and build a red brick house.

On top of each piece of wood, a gap was dug with a chisel and connected using a tenon structure, and it didn’t take long for his wood estate to have a rough prototype.

But.

The wood has run out.

He was only able to cut the logs again and peel them, and wait for a little dry before he could continue the construction.

It just so happens that he can also take advantage of this point in time to set up the vertical water wheel.

A moment later it was another two days.

After many attempts, Li Mo’s vertical water wheel ushered in the first official use.

The entrance of the aqueduct opened, and the water in the river immediately poured in, directly impacting the water wheel, causing the central shaft to begin to rotate, connecting the paddles, so that the iron pillar began to smash on Li Mo’s prepared wrought iron station one by one.

“After watching it for a week, I finally understand what Li Mo is busy with during this time!”

“This is from manpower to water power, cross-era progress!”

“Everything in Li Mo’s hands has come from scratch, how can I feel that I have a lot of sense of accomplishment!”

“Did the thirty-centimeter guy tell me what else this thing can do with wrought iron?”

“It is more useful, it can be turned into a water exhaust blower with a slight change, and it can also be made into a simple water energy machine tool!”

*

The success of the vertical water wheel made Li Mo very satisfied.

He began to prepare for the pre-task of completing the civilization ascension of the system – building non-human machine tools.

With the knowledge ability instilled in the system, he already has the most elaborate drawings in his mind, and now he only needs to produce and process the corresponding parts and then assemble them.

It’s not a simple matter.

The water wheel is the foundation, equivalent to providing power.

Machine tool gears, reverse gears, bearings, transmission belts, turning tools and milling cutters, etc. need to be processed separately.

Gears and speed gears in the use of the entire lathe, belong to the highest frequency of the place, ordinary pig iron is too brittle, used to make gears soon, need to use steel or forged other alloys to refine.

The bearing needs to be hardened while grinding a sufficiently precise and smooth ball.

Transmission belt, although there are no rubber trees around Li Mo now, but he found that there are many eucommia trees in the mountains, eucommia gum is also a kind of natural rubber, after processing to make a conveyor belt is not a problem, it is really not possible to use bear skin or sheepskin, you can also top one.

As for turning tools and milling cutters, it is more difficult, not only the material hardness must be sufficient but also wear resistance, preferably tungsten titanium cobalt cemented carbide.

The most difficult thing is the shape of these knives, casting is not good casting, it may have to be ground by hand a little bit.

It’s hard to get started.

While building his own log manor, Li Mo transformed a hydraulic blower and built a new iron training furnace in the workshop near the waterwheel.

The work on individual parts of the machine tool began.

At this time.

In addition to walking fast, he felt for the first time the benefits of the fourteen-point agility attribute, that is, his hands were extremely stable, and when he processed parts, he seemed to become a legendary god-level mechanic, and he could feel the slight difference between a few tenths of a millimeter between the workpieces.

Gears, bearings, successively built, eucommia rubber did not live up to his expectations, the effect is comparable to the natural rubber planted in later generations, and the transmission belt is no longer a problem.

In the end, only the raw materials of turning tools and milling cutters remain.

The skill of refining cemented carbide.

Li Mo has it.

With a system, in the current field of the industrial age, there is nothing that will not be

The problem is that those mines that refine alloys are relatively difficult to find, and the nearest mine is a hundred miles away, and several mines may have to travel seven or eight days to bring back.

No way.

Li Mo could only temporarily put down the machine tool and seal the roof of his log manor first.

And then put up the fence.

A wild log-style manor is built.

However, to live comfortably inside, you have to build a kitchen and bathroom in the reserved place, and Li Mo is even ready to build a torch.

These can only come later.

After turning all the remaining lamb into jerky, he made himself a pair of bearskin boots and a sheepskin jacket with a needle, and then set out to find cemented carbide raw materials.

Dragon Boat reading discount! Charge 100 and get 500 VIP bonds!

immediately preemptive(Event Period: June 22 to June 24)


Tap the screen to use advanced tools Tip: You can use left and right keyboard keys to browse between chapters.

You'll Also Like