"I've sold you, and Lao Wu and I would be extremely happy if we could exchange electricity!"

"But the problem is that you're worthless!" Seeing the person coming, Yang Zhijun said with a smile while making a cup of tea.

"Well, you can't say that, what do you mean I'm worthless?"

"Every time you go to my place to ask for electricity, you don't have this attitude!"

"Old Wu!" The visitor responded dissatisfiedly to Yang Zhijun, and then nodded to Wu Jiashan.

"This is?" The visitor sat down beside Wu Jiashan, looked at Wu Qingfeng, and looked at Wu Jiashan with some doubts.

Wu Jiashan just wanted to introduce.

Yang Zhijun handed the teacup to the visitor, and said with a smile, "This is Wu Qingfeng, a fellow entrepreneur who came back and worked hard for the development of Hengcheng!"

"Brother, this is Hong Tao, the director of the power supply station."

"In our Hengcheng area, this guy is known as the King of Electric Hades, and he hates the sky and the air. I dare not mess with him!" Yang Zhijun glanced at Hong Tao, and smiled at Wu Qingfeng.

Electric Hades?

Beat the sky and beat the air?

Wu Qingfeng almost couldn't help laughing, but the director of the power supply station is at the county and town level, and he has very powerful rights.

Because the director of the power supply station can only be managed by the city's power supply bureau, the county and town chiefs can't stop it.

It is not an exaggeration to be called the king of electricity, especially the big electricity users. If you offend the county and town officials, you will suffer a petty crime, but if you offend the director of the power supply station, you will lose your money.

Unless you make money without electricity.

"Hello, Director Hong!" Wu Qingfeng stood up first and stretched out his hand with a smile.

"Hello, Mr. Wu!"

"Don't listen to Lao Yang's nonsense, what kind of Electric Hades, he is trying to ruin my reputation everywhere!" Hong Tao laughed.

Wu Qingfeng smiled and let go.

Seeing that Wu Qingfeng didn't answer, Hong Tao didn't say much, so he sat down, picked up his teacup, and started blowing.

He is not a fool, Yang Zhijun was very close to Wu Qingfeng, and Yang Zhijun called him here on this occasion.

He guessed [-]% that Wu Qingfeng is also a big investment boss, and asked him to coordinate the electricity.

In fact, he really didn't want to come, but Yang Zhijun is a magistrate, so he has to give face, whether there is electricity or not, at least his attitude should be respected.

Although Yang Zhijun couldn't stop him, Hengcheng's location is very special. I heard from the city that Hengcheng will be upgraded soon. Whether he can go further by then depends on the opinions of local officials like Yang Zhijun.

"What's the matter, old Hong, you usually can't hold your words in a basket, why are you becoming a gentleman now?" Yang Zhijun laughed when he saw Hong Tao blowing tea without saying a word.

"I see, Lao Hong, he is afraid that we will need electricity!" Wu Jiashan beside him couldn't help laughing.

In fact, they all understood Hong Tao.

This guy is also battered by electricity. Don't look at the majesty of the king of electricity, but how to manage more than [-] people in an orderly manner is not easy.

At the same time, it is not easy to distribute electricity to hundreds of small-scale enterprises in the town.

"Don't worry, I won't ask you for electricity today, maybe you will be able to ask for electricity in the future, so don't worry about it for a while!" Yang Zhijun saw that Hong Tao was a little wary, so he didn't intend to make a detour.

"What do you mean?" Hong Tao was taken aback.

Then he said with some vigilance: "Old Yang, don't try to trick me. In a word, if you need electricity, you only need one person."

"Last month, I went to the power supply bureau to find the director, and I was directly bullied for a long time, saying that the development of Anshi is more important than the development of Hengcheng. Anshi has not yet developed, and Hengcheng wants extra electricity. There is no way!"

"I also said that I can find a way to overcome the difficulties by myself, and the power distribution of the municipal power supply bureau is also confused."

"In short, the electricity didn't turn up to one degree, but I went to listen to ideological education for more than an hour."

"So, Lao Yang, it's not that I don't do things, but that I really don't. Hengcheng is developing too fast, and our electricity is really annoying." Hong Tao smiled wryly, and quickly expressed his opinion. In person, face-to-face, that's not it either.

As a native of Hengcheng, he certainly hopes that his hometown will flourish, but the constraints of electricity are not so easy to solve.

There is nothing the city can do, let alone the director of a small power supply station.

"Let's go through it slowly. After four or five years, when the Ganges River Reservoir is completed, we Hengcheng Electric Power should be able to liberate part of it." Hong Tao shook his head and said.

"Ganges Reservoir? Did you go to see it?" Yang Zhijun asked quickly after hearing the words.

Wu Jiashan also put down his teacup and looked at Hong Tao.

Wu Qingfeng's gaze was no exception.

Hengcheng Reservoir, he has heard that the dam site of the Ganges River Reservoir is located in the lower reaches of the Ganges River in Hengcheng, Anshi. The project is mainly for water supply and irrigation, and has comprehensive benefits such as power generation.

The normal storage level of the planned reservoir is 416 meters high, with a total investment of 12.8 billion yuan.

The land occupation and inundation scope of the project involve Guanping Village and Guanba Village of Dahe Town, and Huazhou Village of Hengcheng, a total of 3 administrative villages.

The construction of the Ganges Reservoir is a major event in the political, economic and social life of the people of Hengcheng. It is the key project with the largest investment scale in the history of Hengcheng.

He had heard of it, but didn't know much about it.

It was only "started" in October last year, and it is estimated that it will take four or five years to complete.

"I read it and asked about the specific construction plan. The project is divided into two phases. The first phase is the dam, flood discharge structures, water diversion power generation system, water source engineering and other reservoir ancillary projects.

The second phase is water supply projects such as water transmission and distribution projects and construction of purification and sewage plants, with a total construction period of 42 months. " Hong Tao said.

"In 17, the plan was issued, and in 18, the tender was called for. Last October, construction was "started". You should move to start construction.

The construction period is 42 months, and I don't think it will be completed in 62 months! "Wu Jiashan said fussily from the side.

"Okay, old Wu, it's fine to make a fuss about it, it's meaningless." Yang Zhijun shook his head.

He is also very dissatisfied.

Because the biggest beneficiary of the Ganges Reservoir is Hengcheng, but this is a national key water conservancy project led by the city. Why is the timeline so long? As a senior town official, he doesn’t understand it, but the reality is like this. Officials can only make a fuss like Wu Jiashan.

Hong Tao smiled, the project of the Ganges Reservoir is difficult to approve.

Because the Ganges Reservoir is on the site of Hanwangping, Hanwangping, in the third national cultural relics census in Anshi in 2009, the ruins of the ancient city that had gone through the Warring States Qin and Han Dynasties and the Jin and Southern and Northern Dynasties were discovered here. The site is about 600 meters long from east to west and about 500 meters wide from north to south. meters, covering an area of ​​nearly 30 square meters.

At present, it is the largest urban site discovered at the southern foot of the Qinling Mountains. A large number of gray and red Jomon rubbles are scattered on the surface. There are many faults exposed in the site area. The cultural layer is 1-2 meters thick, and the connotation is extremely rich. Pressed, the cross-section adopts Jomon tiles, simple tiles, moiré tiles, and terracotta tripod legs.

As an important post town on Ziwu Road, the site has important historical value for the study of the administrative system of the Warring States Period, Qin and Han Dynasties, and the Southern and Northern Dynasties, as well as the history of Ziwu Road.

It is precisely because of this that the State Administration of Cultural Heritage needs to issue approval documents, so the actual construction has not yet started.

Tap the screen to use advanced tools Tip: You can use left and right keyboard keys to browse between chapters.

You'll Also Like